YearBook
Back to listing
2800 Speakman Drive,
Mississauga,
ON,
L5K 2R7,
Canada
T: +1 905 855 7600
F: +1 905 855 8270
Selected References: EPCM
- Copper mine, Confidential client, Chile 2013, 63,900 m³/d RO
- Copper mine, Confidential client, Chile 2013, 29,800 m³/d RO
- Candelaria, Punta Padrones, Region III, Chile 2012, 43,200 m³/d RO
- Goldcorp, El Morro, Chile 2011, 64,000 m³/d RO
- Koniambo, Koné, New Caledonia, WA, Australia 2011, RO
- Mosaic, Tampa Bay, FL, United States 2008, 36,000 m³/d RO
- Transnet, Saldanha Bay, South Africa 2008, 2,400 m³/d RO
- Cockburn Sound, Perth, WA, Australia 2007, 143,700 m³/d RO
- BHP Billiton, Ravenshtorpe, WA, Australia 2007, 7,200 m³/d MED
- Murrin Murrin, WA, Australia 2000, 12,000 m³/d RO
Selected References: Design Engineer
- Port Stanvac, Adelaide, SA, Australia 2012, 273,800 m³/d RO
- Citic Pacific, WA, Australia 2011, 139,600 m³/d RO
- Luggage Point, QLD, Australia 2008, 66,000 m³/d RO
Selected References: Engineering: Pipelines
- Port Stanvac, Adelaide, SA, Australia 2012, 273,800 m³/d RO
Selected References: Owner's Engineer
- Candelaria, Punta Padrones, Region III, Chile 2011, 43,200 m³/d RO
Selected References: Engineering - Pipelines
- Chile 2010, 276,480 m³/d RO
- Australia 2010, 10,000 m³/d Other / Unknown
- Australia 2008, 102,000 m³/d RO
Selected References: Engineer of record
- Tampa Bay Water, FL, United States 2007, 94,600 m³/d RO
Selected References: Engineering - pipelines
- Chile 2007, 73,699 m³/d RO
- Chile 2007, 26,400 m³/d RO
- Chile 2007, 21,600 m³/d RO
- Australia 2007, 13,250 m³/d MED
- Chile 2007, 12,960 m³/d RO
- Oman 2007, 12,096 m³/d RO
- Canada 2007, 440 m³/d
- Chile 2006, 43,200 m³/d RO
- Canada 2006, 12,960 m³/d RO
- Chile 2005, 28,512 m³/d RO
- Canada 2004, 1,362 m³/d RO
Selected References: Technical Advisor
- Carlsbad, San Diego, United States, 189,250 m³/d RO
Selected References: Technical Advisor
- United Arab Emirates, 110,000 m³/d RO