Volume 62, 2026, Issue 36
Perur SWRO plant reaches 62% completion
Construction of India’s 400,000 m3/d (105.7 MGD) Perur SWRO Plant has reportedly reached a 62% completion level. A Metito-VA Tech Wabag consortium...
Construction of India’s 400,000 m3/d (105.7 MGD) Perur SWRO Plant has reportedly reached a 62% completion level. A Metito-VA Tech Wabag consortium...