Volume 62, 2026, Issue 12
LADWP recommends CDM Smith desal study contract
In response to a 2025 RFP for a seawater desal feasibility study, the Los Angeles Department of Water & Power (LADWP) evaluation committee has...
In response to a 2025 RFP for a seawater desal feasibility study, the Los Angeles Department of Water & Power (LADWP) evaluation committee has...